ECG Tema H To B
Construction of a 2x60MVA 33kV Overhead Line from Substation H to Substation B, Tema.Project Details:
Construction of a 2x60MVA 33kV Overhead Line from Substation H to Substation B, Tema.
Construction of about 4.3km of 33kV Steel tubular pole.
Overhead Sub-transmission line of which AV Hermon’s scope included survey works and profile design, pole spotting, foundations, erection and stringing.